Mega steel panel formwork with stainless steel sheeting

In Meteren, the Netherlands, they're working on the construction of the Southwest Curve, a new rail link between the Betuweroute and the line heading toward the southern Netherlands.

In Meteren, the Netherlands, they're working on the construction of the Southwest Curve, a new rail link between the Betuweroute and the line heading toward the southern Netherlands. Currently, the Brabantroute is heavily congested due to the combination of freight and passenger trains. Thanks to this new rail arc, freight trains from the Betuweroute will be able to travel directly south, freeing up more capacity for passenger traffic on the Brabantroute. Between 2025 and 2030, as part of this project, two new bridges will be built and the Betuweroute will be relocated northward by approximately sixty meters. The project includes a pergola bridge over the Utrecht-Den Bosch rail line and a trough bridge over the A15 and the Betuweroute. For both bridge structures, Van Hattum & Blankevoort drew on the expertise of Construx Infra and Construx Rental.
Standard Bridge Pier Formwork
For the construction of the Southwest Arch, Construx Infra, based in Maarsbergen, supplied the standard bridge pier formwork. This formwork was used a total of 31 times for piers ranging in height from 6.2 meters to 11.8 meters. At the base of the piers, a formwork box was placed on the footings in combination with the Construx Rental system formwork. After pouring, the inner formwork could be lowered using a wheeled system and easily rolled out.
Through-Shaped Pier Formwork
The through-shaped pier formwork was also constructed by Construx Infra in collaboration with Construx Rental. This solution combined custom-made curved moulds from Construx Infra with MEGA panels from Construx Rental’s product range. The formwork was used for heights ranging from 6 to 12 meters. Both the inner and outer formwork were fitted with custom filler pieces so that center pins could pass through the MEGA panels. The formwork was used six times. Although the widths varied, the curves remained identical, and the differences were accommodated by the flexible use of the MEGA panels.
Closure Pour Formwork
Construx Infra also supplied Closure Pour Formwork for all column formwork. The formwork is equipped with height-adjustable beveled edges, which ensure compliance with the flatness requirements of the support blocks. Two versions were used for this purpose: a standard type and an adjustable type.
Support of the approach Spans
After the piers were constructed, work began on supporting the approach spans, the spans between the piers and the abutments. A formwork box equipped with hydraulic jacks was used for this purpose. This solution was employed eight times, with the spacing between the piers and abutments adjusted accordingly. Seven intermediate spans, each 12.5 meters long, and four end spans, each 10 meters long, were provided to achieve the desired configuration.
Pergola Formwork
Finally, Construx Infra also supplied formwork for the pergola bridge. In this construction method, a pier is first poured against a bottom beam, after which a top beam is poured onto the pier. A distinctive feature of this formwork is that it can be anchored exclusively to the bottom beam and the work platform. The structure was 9.8 meters high and was constructed in two different widths.